For 88 State Circle, we removed the damaged mortar, replaced it with historically correct lime mortar, cut the joint to match the original brick, and patched any damaged brick.
The scope of work for this project included masonry spot pointing throughout, wood repair and replacement, and a new coat of paint on exterior elements.
After a car accident damaged the exterior wall and fence, Durable Restoration restored the damaged brick and iron fence with historically accurate alternatives.
Our scope of work included repairing the building's skylight, installing mirror-coated glass panels, and replicating upper vent caps and seam caps over glass rails in copper.
The Bell tower experienced a full exterior restoration which included removing and replacing all of the slate on the main steeple and a smaller turret, along with a complete reconstruction of two hand carved finials.