Category: Featured Projects

October 17, 2020
Edgar Allen Poe House Museum

The scope of work for this project included masonry spot pointing throughout, wood repair and replacement, and a new coat of paint on exterior elements.

October 17, 2020
Library of Congress

We are restoring the verdigris patina from the bronze to bring it back to its original satin finish.

October 17, 2020
Annaburg Manor

Annaburg Manor’s distinctive colors and ornate details will be a crowning achievement for DRC and a beautiful new social center for the city of Manassas, Virginia.

October 17, 2020
The Burgwin-Wright House Museum

The scope of this project included the preservation of the cedar shake roof, brick chimneys, and foundation walls.

October 17, 2020
David's United Church of Christ

Durable Restoration restored both the bell tower and the steeple on this historic church.

October 17, 2020
Steeple Square

Over the course of this project, our crews installed more than 15,000 pounds of copper as well as various copper elements to the steeple.

October 17, 2020
Baltimore City Hall

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

October 17, 2020
The Flag House

After a car accident damaged the exterior wall and fence, Durable Restoration restored the damaged brick and iron fence with historically accurate alternatives.

October 17, 2020
Cincinnati Union Terminal

The steel structural support of Union Terminal began to rust, pushing the bricks out of the structure. Durable Restoration restoring the damaged brick to replicate the original façade.

October 10, 2020
St. Andrews Roman Catholic Church

The restoration process of St. Andrew's Catholic Church included 3 phases. These phases included restoring both steeples, restoring the center spire with new copper, and the installation of a new Buckingham slate roof.