Failed stucco was restored back to sound stucco and damaged clay bricks were removed and replaced with salvaged replacements. New downspouts were installed to direct water past the outer wall.
The scope of work for St. John's Episcopal Church included restoring the church's front steps that cracked due to corrosion caused by the metal railings.
Our scope of work for this project included rebuilding the structure of the cupola, replacing the large skylights, and installing a custom gutter system.