Our crews restored this 1929 concrete and aggregate bridge. Historic elements were removed and stripped then re-coated off site while the physical historic bridge was shored so that the road could be modernized to FDOT standards (meaning a great deal of vibration and pile driving) without affecting the historic structure. The elements were reinstalled, the bridge was repointed and finally re coated with a mineral coating which restored to a preserved state.